Page 2Pentair Water Commercial Pool and Spa
TABLE OF CONTENTS
SECTION 1. |
| SECTION 3. |
| |||
General Information |
| Operation |
| |||
1.1 | Introduction | 3 | 3.1 | Controls - General | 11 | |
1.2 | Heater Identification | 3 | 3.2 | Initial | 11 | |
1.3 | Primary/Secondary Pump and Piping | 3 | 3.3 | Safety Shutoff Component Checkout | 12 | |
1.4 | Certifications | 3 | 3.4 | Inlet Temperature and |
| |
1.5 | Engineering Assistance | 3 |
| Temperature Rise Adjustment | 12 | |
SECTION 2. |
| 3.5 | Heater Shut Down | 13 | ||
| 3.6 | Spring and Fall Operation |
| |||
Installation |
|
| 13 | |||
2.1 | Boiler Placement | 4 | 3.7 | Winter Operation Complete Shutdown | 14 | |
3.8 | Time Clock Operation | 14 | ||||
2.2 | Installation of Indoor Boilers | 4 | ||||
3.9 | Therapeutic Pools (Spas) | 14 | ||||
2.2.1 | Combustion Air Supply | 4 | ||||
|
|
| ||||
2.2.2 | Venting | 5 | SECTION 4. |
| ||
2.2.3 | Common Venting System |
|
| |||
| Test Procedure | 6 | Maintenance | 15 |
2.2.3Instructions Relatives au Test des
| Systèmes à Évent Commun | 6 | SECTION 5. |
| |
2.3 | Installation of Outdoor Boilers | 7 | Troubleshooting | 16 | |
2.4 | Gas Supply and Piping | 7 | |||
|
| ||||
2.5 | Electrical Wiring | 8 | SECTION 6. |
| |
2.6 | General Piping Instructions | 9 |
| ||
Parts Description and Order Numbers | 17 | ||||
2.7 | Boiler | 9 | |||
|
|
2.8Temperature Sensor Placement
| and Installation | 10 |
2.9 | Automatic Chlorinators | 10 |
Pentair Technical Support
Sanford, North Carolina (8 A.M. to 5 P.M.)
Phone: (800)
Fax: (919)
Moorpark, California (8 A.M. to 5 P.M.)
Phone: (800)
Fax: (800)
Web sites: visit www.pentairpool.com and www.staritepool.com