Poulan PRRT900 manual Tools Required for Assembly, OPERATOR’S Position See Fig

Page 4

ASSEMBLY

Your new tiller has been assembled at the factory with exception of those parts left unassembled for shipping purposes. To ensure safe and proper operation of your tiller all parts and hardware you assemble must be tightened securely. Use the correct tools as necessary to insure proper tightness.

TOOLS REQUIRED FOR ASSEMBLY

A socket wrench set will make assembly easier. Standard wrench sizes are listed.

(1) Utility knife

(1)Tire pressure gauge

(1)Pair of pliers

(1)9/16" wrench

OPERATOR’S POSITION (See Fig. 1)

When right or left hand is mentioned in this manual, it means when you are in the operating position (standing behind tiller handles).

LEFT

FRONT

RIGHT

OPERATOR’S

POSITION

Fig. 1

CONTENTS OF HARDWARE PACK

 

(2) Handle Locks

(1) Carriage Bolt

(1) Center Locknut

 

3/8-16 UNC x 1 Grade 5

3/8-16 UNC

(1) Flat Washer 13/32 x 1 x 11 Gauge

(1) Handle Lock Lever

(1) Hairpin Clip

(1) Pivot Bolt

 

 

3/8-16 UNC Grade 5

Extra Shear Pins & Clips

 

4

 

Image 4
Contents PRRT900 Safety Rules Maintenance and StorageTraining PreparationTable of Contents Assembly Tools Required for AssemblyContents of Hardware Pack OPERATOR’S Position See FigInstall Handle See Figs , 4, Unpacking Carton See FigAttach Clutch Cable See Fig Connect Shift ROD See FigRemove Tiller from Crate Check Tire PressureOperation Meets Ansi Safety RequirementsKnow Your Tiller HOW to USE Your Tiller Tine Operation with Wheel DriveForward Wheels ONLY/TINES Stopped Reverse Wheels ONLY/TINES StoppedTurning To TransportBefore Starting Engine Fill Engine with OIL See FigADD Gasoline To Start Engine See FigTilling Hints Tine Shear PinsCultivating Maintenance Lubrication ChartGeneral Recommendations Before Each USEEngine AIR Cleaner See FigTo Change Engine OIL See Figs Cleaning Cooling System See FigMuffler Spark PlugTiller Service and AdjustmentsTire Care Ground Drive Belt Adjustment S e e Fig To Replace Ground Drive Belt See FigsTine Replacement See Figs , 25 Storage OtherFuel System Engine OILTroubleshooting Points Service Notes Stevens Creek Road Ordan Drive Augusta, GA 30907 USA Customer Service DeptL5T 1K6 Parts and Service Changere DE Pièces LES ET L’ENTRETIEN Initiale d’achat date la de compter à jours Dept Service Customer Canada AuArticles des fabricant du ’ENTRETIEN Remarques Dépannage DE Guide LabourageEntreposage CylindresMoteur DE Huile Dalimentation SystèmeRéglages ET Révision 26 .Fig25 .Fig 24 .FigFig la Voir Terre À 23 et 22 .Fig les Voir Terre À Nement ’ENTRAÎNEMENT Courroie LA Régler’ENTRAÎCOURROIELAREMPLACERPOUR 23 .FigFig la Voir Roie Fig la Voir Roue LA Enlever PourPneus DES Soin Fig la VoirEntretien ’ALLUMAGE BougieNettoyage SilencieuxMoteur LubrificationLubrification DE Tableau LubrificationUtilisation Chaque Avant LUBRIFICATION DE TableauUtilisation BinageLabourage DE Conseils Dents DES Cisaillement DE Boulons’ESSENCE Réservoir LE Remplir Fig la Voir Moteur DU Démarrage13 .Fig Moteur DU Démarrage LE Avant Fig la Voir LabourageTransporter Pour VirerFig la Voir Profondeur DE Jauge MENT/LESLESEU ROUES-AVANT MarcheRoue DE Deman COM LA Avec -FRAISES DES UtilisationAnsi Sécurité DE Exigences AUX Conforme Motobineuse Votre ConnaissezMontage Poignee DE HauteurPneu DE Pression LA Verifier Carton DU Motobineuse LA EnleverPoignee LA Installer Et 4, 3, .Fig les VoirFig la Voir Carton LE Deballer Coupez poignée, la de l’ensemble teniez vous que PendantPièces DES SAC DU Contenu Fig la Voir D’OPERATEUR PositionMontage LE Pour Exiges Outils LES De Clé 1 Pince 1 pneu à Manomètre 1 usage tout à CouteauSommaire Client DU ResponsabilitésElle .motobineuse d’une achat votre pour Félicitations Dallumage BougieSécurité DE Règles Entreposage ET EntretienMotobineuses des Sécurité toute En lUtilisation pour ConseilsPRRT900