Poulan PRRT900 Attach Clutch Cable See Fig, Connect Shift ROD See Fig, Remove Tiller from Crate

Page 6

ASSEMBLY

ATTACH CLUTCH CABLE (See Fig. 6)

Hook end of clutch cable through hole in control bar bracket.

CONTROL BAR

BRACKET

CONTROL

BAR

CLUTCH

CABLE

CONTROL BAR

BRACKET

END OF CLUTCH

CABLE

Fig. 6

CONNECT SHIFT ROD (See Fig. 7)

Insert end of shift rod into hole of shift lever indicator.

Insert hairpin clip through hole of shift rod to secure.

SHIFT

HAIRPIN

SHIFT

CLIP

LEVER

ROD

 

INDICATOR

 

 

Fig. 7

REMOVE TILLER FROM CRATE

Make sure shift lever indicator is in “N” position (See Fig. 7)

Tilt tiller forward by lifting handle. Separate cardboard cover from leveling shield.

Rotate tiller handle to the right and pull tiller out of carton.

CHECK TIRE PRESSURE

The tires on your unit were overinflated at the factory for shipping purposes. Correct and equal tire pressure is important for best tilling performance.

Reduce tire pressure to 20 PSI (1.4 kg/cm2).

HANDLE HEIGHT

Handle height may be adjusted to better suit operator. (See “TO ADJUST HANDLE HEIGHT” in the Service and Adjustments section of this manual).

6

Image 6
Contents PRRT900 Training Safety RulesMaintenance and Storage PreparationTable of Contents Contents of Hardware Pack AssemblyTools Required for Assembly OPERATOR’S Position See FigInstall Handle See Figs , 4, Unpacking Carton See FigRemove Tiller from Crate Attach Clutch Cable See FigConnect Shift ROD See Fig Check Tire PressureMeets Ansi Safety Requirements OperationKnow Your Tiller Forward Wheels ONLY/TINES Stopped HOW to USE Your TillerTine Operation with Wheel Drive Reverse Wheels ONLY/TINES StoppedBefore Starting Engine TurningTo Transport Fill Engine with OIL See FigADD Gasoline To Start Engine See FigTine Shear Pins Tilling HintsCultivating General Recommendations MaintenanceLubrication Chart Before Each USEAIR Cleaner See Fig EngineTo Change Engine OIL See Figs Muffler CleaningCooling System See Fig Spark PlugService and Adjustments TillerTire Care Ground Drive Belt Adjustment S e e Fig To Replace Ground Drive Belt See FigsTine Replacement See Figs , 25 Fuel System StorageOther Engine OILTroubleshooting Points Service Notes Customer Service Dept Stevens Creek Road Ordan Drive Augusta, GA 30907 USAL5T 1K6 Parts and Service Changere DE Pièces LES ET L’ENTRETIEN Dept Service Customer Canada Au Initiale d’achat date la de compter à joursArticles des fabricant du ’ENTRETIEN Remarques Dépannage DE Guide LabourageMoteur DE Huile EntreposageCylindres Dalimentation Système25 .Fig Réglages ET Révision26 .Fig 24 .Fig’ENTRAÎCOURROIELAREMPLACERPOUR Fig la Voir Terre À 23 et 22 .Fig les Voir Terre À Nement’ENTRAÎNEMENT Courroie LA Régler 23 .FigPneus DES Soin Fig la Voir RoieFig la Voir Roue LA Enlever Pour Fig la VoirNettoyage Entretien’ALLUMAGE Bougie SilencieuxMoteur LubrificationUtilisation Chaque Avant Lubrification DE TableauLubrification LUBRIFICATION DE TableauLabourage DE Conseils UtilisationBinage Dents DES Cisaillement DE BoulonsFig la Voir Moteur DU Démarrage ’ESSENCE Réservoir LE Remplir13 .Fig Transporter Pour Moteur DU Démarrage LE AvantFig la Voir Labourage VirerRoue DE Deman Fig la Voir Profondeur DE JaugeMENT/LESLESEU ROUES-AVANT Marche COM LA Avec -FRAISES DES UtilisationAnsi Sécurité DE Exigences AUX Conforme Motobineuse Votre ConnaissezPneu DE Pression LA Verifier MontagePoignee DE Hauteur Carton DU Motobineuse LA EnleverFig la Voir Carton LE Deballer Poignee LA InstallerEt 4, 3, .Fig les Voir Coupez poignée, la de l’ensemble teniez vous que PendantMontage LE Pour Exiges Outils LES Pièces DES SAC DU ContenuFig la Voir D’OPERATEUR Position De Clé 1 Pince 1 pneu à Manomètre 1 usage tout à CouteauElle .motobineuse d’une achat votre pour Félicitations SommaireClient DU Responsabilités Dallumage BougieMotobineuses des Sécurité toute Sécurité DE RèglesEntreposage ET Entretien En lUtilisation pour ConseilsPRRT900