ASSEMBLY
UNPACK CARTON & INSTALL HANDLE (See Fig. 1)
CAUTION: Be careful of exposed staples when handling or disposing of carton material.
IMPORTANT: WHEN UNPACKING AND ASSEMBLING TILLER, BE CAREFUL NOT TO STRETCH OR KINK CABLE(S).
•Cut cable ties securing handle column.
•Route cable(s) as shown and slide handle column onto handle mount.
•Remove all packing from carton.
•Secure handle column using two (2) carriage bolts and two (2) flange locknuts. Tighten securely.
•Cut away carton.
•Route tine control cable(s) through plastic cable clip on handle mount.
NOTE: Cables must not touch the muffler.
•Cut cable ties securing tiller to skid. Remove tiller from skid by pulling backwards.
•Remove screws securing depth stake to skid and discard the screws.
Tine Control
Tine
Control
Cable
Handle
Column
Handle
Mount
Carriage
Bolt
Flange
Locknut
Fig. 1
INSTALL DEPTH STAKE ASSEMBLY (See Fig. 2)
•Loosen nut “A”.
•Insert stake support between engine bracket halves with stake spring down.
•Bolt stake support to engine brackets with bolts, lock washers and nuts. Tighten securely. Tighten nut “A”.
•Depth stake must move freely. If it does not, loosen support bolt.
Engine Bracket Halves
Nut “A”
Depth Stake Support
Depth
Stake
Support Bolt
Stake Spring
Hex Bolts, Lock Washers, and hex Nuts
Fig. 2
HANDLE HEIGHT
•Handle height may be adjusted to better suit operator. (See “HANDLE HEIGHT” in the Service and Adjust- ments section of this manual).
TILLING WIDTH
•Tilling width may be adjusted to better handle your tilling conditions (See “TINE ARRANGEMENT” in the Service and Adjustments section of this manual).
TINE OPERATION
•Check tine operation before first use. (See “TINE OPERATION CHECK” in the Service and Adjustments section of this manual).
5