Buhler 45 Series warranty Field Operation contd

Page 17

45 Series Rotary Tiller

FIELD OPERATION - cont'd.

e.The rotation of the Tines propel the machine in the forward direction. Always use the tractor transmission to control the speed of forward travel.

f.Always disengage the PTO control and raise the machine out of the ground before depressing the master clutch on the tractor.

g.Use low gear on the tractor to start the job. Increase the speed of forward travel only as the quality of the job and power available will allow.

h.If the slip clutch slips, reduce the ground speed or raise the machine slightly out of the ground.

- 16 -

Image 17
Contents Table of Contents Description Important Facts Warranty ClaimsWarranty Labor Introduction Think SAFETY! Work Safely SafetyOperating Safety General SafetyTransport Safety Maintenance SafetyStorage Safety Safety SignsWork Safely How to Install Safety signsSafety Sign Locations Safety Sign Locations cont’d Machine Components Operation To the NEW Operator or OwnerMachine BREAK-IN PRE-OPERATION ChecklistEquipment Matching Horsepower vs. Wid thPoint Hitch Load Sensing HydraulicsDriveline Dimension Driveline Dimension Contd ATTACHING/UNHOOKING Field Operation Field Operation contd Field Operation contd Transporting Speed vs. weight RatioStorage Greasing Service and MaintenanceFluids and Lubricants Hours or once a season Servicing IntervalsAnnually Servicing Intervals cont’d HoursTine Replacement MaintenanceFrame Adjustment Slip Clutch Clutch MaintenanceProblem Cause Solution Trouble ShootingAssembly Bolt Torque English Torque SpecificationsSeries Tiller Series Rotary Tiller Description Parts List When Ordering PartsPage Page Series Tiller Gearbox #906913 PTO F0409 Series Tiller PTO Parts List Options Shipping BundlesQuantity Bundle Required Number