PORTABILITY KIT INSTALLATION
CORD SET
TOOLS REQUIRED: 7/16”, 1/2” and 9/16" sockets and ratchets, block(s) of wood (minimum of 6” tall).
Refer to the parts list and drawing on pages 8 and 9.
WHEEL INSTALLATION
1.Block up end of generator opposite the fuel tank cap to install wheel kit.
2.Insert wheel spacer (item 43) into the center of the wheel
(item 35).
3.Slide 3/8 x 4.25” bolt (item 41) and 3/8 washer (item 38) through the wheel (item 35), then through the wheel bracket on the carrier, with the offset side of the wheel hub against the wheel bracket.
4.Thread 3/8 nyloc nut (item 42) onto the bolt and tighten to securely clamp the wheel assembly to the carrier.
5.Repeat above instructions for the remaining wheel.
FOOT INSTALLATION
1.Blocking up the engine side of the generator, place the foot bracket (item 50) under the carrier channel. Thread a
Caution: Do not over tighten so that the rubber foot material collapses.
LOCKING HANDLE
1.Attach the lanyard (item 39) to the release pin (item 44) and carrier as shown in the illustration.
2.To lock the handle (item 31) in the extended position, align the holes in the handle bracket with the holes in the carrier bracket and insert the release pin (item 44).
3.Insert caps (item 45) into ends of handle (item 31)
Your generator is supplied with a 25 foot 12 GA SJTW
You will notice that the
1
2
|
|
|
English | 3 | |
|
|
|
|
|
|