Powermate PC0105000 Starting the Unit, PRE-START Preparation, Starting the Engine, Applying Load

Page 9

STARTING THE UNIT

Gasoline is very dangerous.

Serious injury or death may result from fire caused by gasoline contacting hot surfaces.

1.Do not fill fuel tank with engine running.

2.Do not spill fuel while refilling tank.

3.Do not mix oil with gasoline.

4.Follow all instructions and warnings in the operator manual.

PRE-START PREPARATION

Before starting the generator, check for loose or missing parts and for any damage which may have occurred during shipment.

This generator must not be operated without all factory installed heat shields in place. Failure to comply may cause the fuel tank to overheat and result in personal injury from fire.

STARTING THE ENGINE

1.Check oil level and fuel.

2.Disconnect all electrical loads from the unit.

3.Open fuel shut off valve.

4.Adjust choke as necessary.

5.Set the engine switch to the “ON" position.

6.Pull on the starter rope with fast steady pull. As the engine warms up, readjust the choke. On electric start models, turn the key switch to “START”. Release key switch after the engine starts.

Allow generator to run at no load for five minutes upon each initial start-up to permit engine and generator to stabilize.

Provide adequate ventilation for toxic exhaust gases and cooling air flow.

Do not start or run the generator in an enclosed area, even if door or windows are open.

Engines give off carbon monoxide, an odorless, colorless, poison gas.

Breathing carbon monoxide can cause nausea, fainting or death.

APPLYING LOAD

This unit has been pretested and adjusted to handle its full capacity. When starting the generator, disconnect all load. Apply load only after generator is running. Voltage is regulated via the engine speed adjusted at the factory for correct output. Readjusting will void warranty.

When applying a load, do not exceed the maximum wattage rating of the generator when using one or more receptacles. Also, do not exceed the amperage rating of any one receptacle.

Do not apply heavy electrical load during break-in period (the first two to three hours of operations).

SHUTTING THE GENERATOR OFF

1.Remove entire electrical load.

2.Let the engine run for two minutes without load.

3.Move the engine switch to the “OFF” position. (Turn the key switch to “OFF” on the electric start models).

4.Do not leave the generator until it has completely stopped.

5.Close the fuel shut off valve if the engine is to be put in storage or transported.

6.If a cover is used, do not install until unit has cooled.

English

 

9

 

Customer Hotline 1-800-445-1805

 

 

 

 

 

Image 9
Contents Alto StopTable of Contents Table DES MatieresIndice Safety and Operation Rules Spark Arrester Determining Total WattageKW = 1,000 watts Operating Voltage InstallationGrounding the Generator Before OperationLubrication LOW OIL SensorGenerator Features Wheel Installation Portability KIT InstallationPRE-START Preparation Starting the UnitStarting the Engine Applying LoadMaintenance Periodic MaintenanceInfrequent Service Service and StorageExciting the Generator Heat ShieldEngine Troubleshooting Engine Specifications Powermate Corporation Airport Road Box Kearney, NE Service Information Limited WarrantyRègles D’OPÉRATION ET DE Sécurité Voire la mortDétermination DE LA Puissance Totale Nécessaire PARE-ÉTINCELLESVérifier LA Tension Mise EN Place DE Lappareil Avant DE Mettre EN MarcheLubrification CarburantCaractéristiques DU Groupe Electrogene Tableau de commande Prise double de 120 V, 20 aPrise à verrouillage de 120/240 V, 30 a DisjoncteursInstallation DES Roues Linstallation DE KIT DE TransportPréparatifs AU Démarrage Demarrage DE LappareilBranchement DES Appareils Démarrage DU MoteurEntretien Entretien PériodiqueLA Bougie D’ALLUMAGE LE Type D’HUILEUsage ET Entreposage Depannage DU Moteur Caracteristiques DU Moteur Service Clientele Commande DE Pièces DE RechangeGarantie Limitée Seguridad Reglas DE Seguridad Y DE FuncionamientoComo Determinar EL Vataje Total ApagachispasEL Requerimiento DE Voltaje InstalacionPuesta a Tierra DEL Generador Antes DE LA OperacionLubricacion EL Sensor DEL Nivel Bajo DE AceiteInterruptor Caracteristicas DEL GeneradorInstalación DE LA Manija Instalacion DEL Juego DE TransportPreparacion Antes DE Arrancar Arranque DEL UnidadArranque DEL Motor Como Aplicar UNA CargaMantenimiento Mantenimiento PeriódicoBujia Tipo DE AceiteExcitacion DEL Generador Servicio Y AlmacenamientoEscudo DE Calor Servicio Poco FrecuenteDeteccion DE Fallos DEL Motor Especificaciones DEL Motor Como Pedir LOS Repuestos Servicio AL Cliente Garantía LimitadaParts Drawing / Schema DES Pièces / Diagrama DE Piezas Part Description Descripción Parts List / Liste DES Pièces / Lista DE PiezasPart Description Descripción QTY Powermate Corporation California and Federal Emission Control Warranty Statement