Standby Generator Sets
Service Schedule
Maintenance | Level 1 |
| Level 2 |
| Level 3 |
| Level 4 |
| Level5 |
|
Tasks | Recom- | Task | Required | Task | Required | Task |
| Task | Required | Task |
| mended | Comp. | to be done | Comp. | to be done | Comp. | Required | Comp. | to be done | Comp. |
| to be done | (Date- | 3 months/ | (Date- | Semi- | (Date- | to be done | (Date- | Bi- | (Date- |
| monthly/ | Initials) | Initials) | annually/ | Initials) | Annually/ | Initials) | annually/ | Initials) | |
| 10 hrs. |
| 30 hrs. |
| 50 hrs. |
| 100 hrs. |
| 250 hrs. |
|
18.Start and exercise the unit at full rated load (use a load bank if the site load is not enough) for at least 2 hours looking for leaks, loose connections or components, and abnormal operating conditions. Correct as necessary.
19.Perform an engine oil analysis (send a
sample to a lab for results). Change the engine oil and filters if the analysis results indicate this is required.
20.Change the engine oil.
21.Replace the engine oil filter(s).
22.Replace engine spark plugs.
Clean and
23. Replace the engine air filter(s).
24.Perform a 5 minute
of the unit looking for any post service problems.
25.Return the unit to standby setup for operation when required.
09/05 A .Rev SrvSchd001