ASSEMBLY / PRE-OPERATION
NOTE: The
UNFOLD UPPER HANDLE
1.Raise upper handle to the operating position and tighten handle knobs securely. Additional carriage bolts, washers and handle knobs are in bag of parts. Use to secure upper handle to lower handle. Install in lower holes in handles.
INSTALL SPEED CONTROL ROD (See Figs. 1 and 2)
1.Remove plastic tie securing rod to lower handle.
2.Insert rod into speed control bracket and secure with retainer spring.
SPEED |
CONTROL |
ROD |
PLASTIC TIE |
UPPER |
HANDLE |
HANDLE |
KNOB |
LOWER |
HANDLE |
FIG. 1
SPEED CONTROL ROD | ||
|
| RETAINER |
|
| SPRING |
SPEED |
| SPEED |
CONTROL | CONTROL | |
BRACKET |
| LEVER |
FIG. 2 | 5 |
INSTALL TRACTION DRIVE CONTROL ROD (See Figs. 3 and 4)
The traction drive control rod is installed on the snow thrower.
1.Remove plastic tie securring rod to lower handle.
2.With top end of rod positioned under left side of control panel, push rod down and insert top end of rod into hole in drive control bracket. Secure with retainer spring.
PLASTIC TIE |
TRACTION DRIVE |
CONTROL ROD |
VINYL |
SLEEVE |
FIG. 3
TRACTION DRIVE | RETAINER |
CONTROL LEVER | SPRING |
| TRACTION |
| DRIVE |
| CONTROL |
| ROD |
DRIVE |
|
CONTROL |
|
BRACKET |
|
FIG. 4