ASSEMBLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATOR HEAD (See Fig. 7)
NOTE: The
1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.
2.Position chute rotator head over chute bracket. If neces- sary,rotatechuteassemblytoalignsquareandpinonun- derside of chute rotator head with holes in chute bracket.
3.With chute rotator head and chute bracket aligned, position chute rotator head on pin and threaded stud of mounting bracket.
4.Install 3/8 washer and locknut on threaded stud and tighten securely.
CHUTE |
|
|
ROTATOR |
| 3/8 LOCKNUT |
HEAD |
|
|
|
| 3/8 WASHER |
|
| PIN |
|
| THREADED |
|
| STUD |
|
| ROTATOR HEAD |
CHUTE | ALIGN BEFORE | MOUNTING |
BRACKET | TIGHTENING LOCKNUT | BRACKET |
FIG. 7
INSTALL CHUTE DEFLECTOR REMOTE CONTROL (See Figs. 8 and 9)
1.Install remote cable bracket to discharge chute with
2.Install remote cable eyelet to chute deflector with
3.Install spring hooks between hex nuts on chute rotater head and into hole in chute deflector as shown.
SPRING | ||
CHUTE | ||
SHOULDER | ||
DEFLECTOR | ||
BOLT | ||
| ||
| HOOK | |
NYLON | BETWEEN | |
WASHER | HEX NUTS | |
ON CHUTE | ||
ROTATER | ||
LOCKNUT | HEAD | |
| ||
| CARRIAGE | |
| BOLT | |
CABLE |
| |
EYELET |
| |
REMOTE |
| |
CABLE |
| |
BRACKET |
| |
| ||
LOCKNUT |
|
FIG. 8
CHUTE DEFLECTOR
CONTROL LEVER
FIG. 9
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac- tory for shipping purposes. Correct and equal tire pressure is important for best snow throwing performance.
•Reduce tire pressure to
7