3.One end of each chute keeper is already attached to the chute flange. Pivot the free end of the chute keeper to align it with the chute flange and push it till it snaps into position. See Figure 4. Repeat with remaining chute keepers.
Chute
Assembly
3
Chute Keeper
Figure 4
For Models with 4 Way Chute Control Box
1.Pull the hairpin clip out of the clevis pin on the chute support tube. Save this hardware. See Figure 5.
Hairpin Clip | 4 Way | |
Chute | ||
| ||
| Control | |
| Box | |
| Clevis | |
| Pin | |
| Chute Support | |
| Tube |
Figure 5
Cables
Short
Tube
Chute Support
Tube
Figure 6
2.Position the chute assembly so the chute opening is facing the front of the unit.
3.Place the chute control box on the short tube of the chute assembly and the chute support tube of the
chute assembly as shown in Figure 6, cables should be towards the operator.
4.Insert the clevis pin, earlier removed, through the holes on the chute control box and chute support tube. Secure with the hairpin clip. See Figure 5.
For All Models without Engine Covers
1.Slip the cables, running from the chute to the handle panel into the cable guide located on top of the engine. See Figure 7 .
Cable Guide
Figure 7
Lamp Wire (optional)
1.Wrap the wire from the lamp down the right handle as shown in Figure 8 .
2.Plug wire into the alternator lead wire under the fuel tank. See Figure 8 inset.
Alternator Lead
Alternator
Lead
Lamp Wire
NOTE: Wheels are omitted from illustration for clarity.
Figure 8
Chute Clean-Out Tool
1.The chute
Final Adjustments
After setting up your snow thrower, check the adjustments as instructed below and make any final adjustments necessary before operating the unit.
CAUTION: Perform the following test before operating the snow thrower for the first time and at the start of each winter season. Failure to comply with these adjustment instructions may cause damage to the unit.
6