Ariens 921023 quick start Step Three Install Discharge Chute Crank

Page 11

Step Three: Install

Discharge Chute Crank

1.Remove the gear cover from top of chute pedestal.

2.Insert the short end of the chute crank into the hole in the front of the control panel.

NOTE: Be careful not to damage nylon bushing when attaching crank to the dash.

3.Connect the chute crank to the pinion gear on chute with hairpin.

4.Replace gear cover on top of chute pedestal.

5.Orient the chute and pedestal to its most vertical position and tighten pedestal hardware to 15 – 31 lbf-ft (20 – 42 N•m).

Image 11
Contents Quick Start Guide Step One Assemble Handlebars Step One Assemble Handlebars Unfold Lower Handlebar Step One Assemble Handlebars Attach Upper Handlebar Assembly Step One Assemble Handlebars Attach Control Cables Step One Assemble Handlebars Unfold Upper Handlebar Step One Assemble Handlebars Connect Headlight Wire Harness Step One Assemble Handlebars Install Trigger Cable Step One Assemble Handlebar Step Two Install Discharge Chute Step Three Install Discharge Chute Crank Step Four Install Remote Deflector Control Cable Step Five Check Function of Dual Handle Interlock Step Six Check Track Tension Step Seven Adjust Skid Shoes Step Eight Check Auger Gearcase Oil Step Nine Check Engine Crankcase Oil Step Ten Fill Engine Fuel Tank Step Eleven Starting the Engine Starting Engine / Step a Throttle Starting Engine / Step B Fuel Valve Starting Engine / Step C Key Starting Engine / Step D Choke Starting Engine / Step E Prime Starting Engine / Step F Manual Start Starting Engine / Step F Electric Start Starting Engine / Step G Electric Start Starting Engine / Step H Warm up Step Twelve Stopping the Engine Additional Resources