6
Clamp Installation
These instructions MUST BE FOLLOWED EXACTLY to prevent the lid from blowing off during system restart or later operation.
1.Perform the following steps before working on any part of the circulating system, e.g., clamp, pump, filter, valve(s), etc.
a.Turn the pump off and shut off any automatic controls to ensure that the system is not inadvertently started during servicing.
b.Open the High Flow™ manual air relief valve until it snaps into the full open position (this only requires a quarter turn counter clockwise).
c.Wait until all pressure is relieved. Never attempt to assemble, disassemble or adjust the filter clamp while there is any pressure in the filter.
2.Be certain the
3.Holding the ends of the filter clamp apart, position the center segment of the filter clamp over both upper and lower tank flanges. Bring the ends of the filter clamp together, while inserting the
4.Using Figure 2 as a guide — place washer (large I.D.) and the
5.Begin to tighten nut using a 7/8 in. wrench. Then tap around the outside of the filter clamp with a mallet (or similar tool) to ensure uniform loading and proper seating of the clamp. Continue tapping and tightening until the spring coils touch each other. Do not tighten beyond this point.
6.Follow the instructions in Section 4; on page 7, SYSTEM RESTART INSTRUCTIONS.
7.The spring coils should be checked at least once per month to ensure that they continue to touch each other, indicating that the clamp is under sufficient tension. If coils fail to touch, repeat Step 5 above.
Figure 2.
Quad D.E.™ Filter Installation and User’s Guide