C H A P T E R 2 | Intel Express 100BASE- TX Stackable Hub |
Site Preparation
Before you install the Express hub, prepare the installation site. Make sure the operating environment meets the physical requirements of the equipment.
Operating | Requirement |
environment |
|
|
|
Temperature | Ambient temperature between 5° C and 40° C |
| (41° F and 104° F) |
| No nearby heat sources such as direct sunlight, |
| warm air exhausts, or heaters |
Humidity | Between 5% and 85% noncondensing |
Ventilation | Minimum 2 in (5.08 cm) on all sides for cooling |
| Adequate airflow in room or wiring closet |
Operating | At least 6 ft (1.83 m) to nearest source of |
conditions | electromagnetic noise (such as photocopy |
| machine or arc welder) |
Service access | Minimum 12 in (19.68 cm) front and rear for |
| service access and maintenance |
| Front and rear clearance for cables and wiring |
| hardware such as punchdown blocks |
Power | Adequate power source within 6 ft (1.83 m) |
Table and shelf | Approximately |
installation | (48.90 cm) area on a level tabletop or shelf |
requirements | Support for at least 10 lbs (4.5 kg) per Express |
| |
| hub with filler panels installed in expansion and |
| media adapter slots |
| Support for at least 12.3 lbs (5.6 kg) per Express |
| hub with an optional NMM installed the |
| expansion slot and an optional media adapter |
| module installed in the media adapter slot |
Rack installation | Standard |
requirements | 1.5 EIA |
| |
| Express hub |
Wiring hardware | Wiring hardware, such as punchdown blocks or |
| patch panels, in place before installing the hub |
12