Contents | |
Introduction | 1 |
Packaged Cabinet | 1 |
Before Unpacking the Cabinet | 3 |
Moving the Cabinet to the Installation Site | 6 |
Unpacking and Checking the Cabinet | 7 |
Tools Needed to Unpack the Cabinet | 8 |
Removing the Packing Materials | 8 |
Removing the Cabinet from the Pallet | 15 |
Checking the Cabinet and Systems | 17 |
Verifying the Express5800/320FcSerial Number | 18 |
Stabilizing the Systems | 19 |
Disposing of Shipping Materials | 20 |
What Happens Next? | 20 |
System Documentation | 20 |