NEC 456-01721-000 manual Contents

Page 3

Contents

Introduction

1

Packaged Cabinet

1

Before Unpacking the Cabinet

3

Moving the Cabinet to the Installation Site

6

Unpacking and Checking the Cabinet

7

Tools Needed to Unpack the Cabinet

8

Removing the Packing Materials

8

Removing the Cabinet from the Pallet

15

Checking the Cabinet and Systems

17

Verifying the Express5800/320FcSerial Number

18

Stabilizing the Systems

19

Disposing of Shipping Materials

20

What Happens Next?

20

System Documentation

20

-iii-

Image 3
Contents NEC Corporation of America Read Me First Unpacking Express5800/320Fc System CabinetsPage Contents Page Packaged Cabinet IntroductionCabinet Packaged for Shipping Tie-down Ramp Before Unpacking the Cabinet Shows the dimensions of a packaged 38U cabinetDimensions of a Packaged 38U Cabinet Dimensions of a Packaged 24U Cabinet 56.5 Moving the Cabinet to the Installation Site To unpack the cabinet Unpacking and Checking the CabinetRemoving the Packing Materials Tools Needed to Unpack the CabinetCutting the Exterior Shipping Straps Remove the plastic wrap encasing the cabinet Removing the Interior Shipping Straps Wooden-Restraint Blocks Inserting the Lever Bar Tilting the Cabinet Sliding Back the Wooden Restraint Blocks Removing the Cabinet from the PalletPosition the Pallet Ramp Moving the Cabinet Down the Pallet Ramp Checking the Cabinet and SystemsVerifying the Express5800/320Fc Serial Number Stabilization Guidelines Stabilizing the SystemsDisposing of Shipping Materials What Happens Next?System Documentation Online support from NEC Technical Support. You Getting Help