NEC 1160Xd, 1320Xd manual Unpacking Procedure, Shipping Container

Page 9

Figure 1 shows the Model 1160Xd/1320Xd shipping container. The smaller container (not shown) includes the following contents:

!Server Stabilizer Kit

!Accessory Box.

Figure 1. Shipping Container

Unpacking Procedure

Note: It is recommended that you save the shipping container, should the server require transport to another location at a later date.

!WARNINGS

Plastic straps securing the packaging may cause injury if the belts snap loose when cut. Use caution when performing the first step of this procedure, protecting the hands and face.

Handling the wooden unloading ramp and the pallet can cause splinters. The use of gloves is recommended.

1.Move the server as close as possible to the computer room where the server is to be installed.

2.Plastic straps secure the shipping box around the server. Carefully cut and remove the plastic straps securing the sides and top of the shipping container. See Figure 2A. It is recommended that you wear gloves and protective eye wear when cutting the plastic straps.

Express5800/1160Xd/1320Xd Installation Procedures 5

Image 9
Contents EXPRESS5800/1160Xd/1320Xd Proprietary Notice and Liability Disclaimer Contents Page Introduction Symbols and ConventionsSafety Notices Safety Notices for Users Outside of the U.S.A. and Canada If you Need HelpSelecting a Site Unpacking the Server Shipping Container Unpacking ProcedureShipping Container Plastic Straps Removing the Corner and Top Protectors Styrofoam Stoppers Lower Plastic Sheathing Rolling the Server Down the Ramp Lowering the Leveling Pads Installing the Side Stabilizer Kit Attaching the LAN Cables Attaching the Power CablesConnecting and Routing the LAN Cables 1160Xd Ether Connector Page 455-01694-000