Emerson STS2 manual Liebert’s transfer control does more than balance the flux

Page 5

Figure 2 Optimized STS transfer

The patented Liebert static switch optimized transfer control algorithm eliminates the downstream transformer inrush saturation.

The Liebert algorithm is designed to optimize transfer timing such that the volt-seconds applied to the downstream transformer primary is balanced, thus minimizing peak saturation current. This balance is achieved by directly computing the volt-second applied to the transformer during transfer events and determining the optimum time to turn on the alternate source SCRs in order to balance the volt- second within specified tolerance.

This results in a volt-second balancing algorithm that is independent of voltage wave shape, voltage failure decay rate, etc., making it superior to other algorithms based on voltage phase angle difference only.

Liebert’s transfer control does more than balance the flux.

Due to our unique approach to the optimized transfer algorithm, transfer time should not be the only performance measure for this new optimized switch. Liebert’s method, whenever possible, also seeks to minimize voltage disturbances while maintaining transformer flux balance. It takes both voltage disturbance and volt-second balance into consideration.

Liebert has a unique flux balance algorithm that doesn’t just “sit and wait” for the balance point to occur. Rather, we will “pulse fire” the SCRs as soon as possible in order to minimize the load discontinuity and hence the voltage disruption.

So how safe is this new optimized Liebert STS2 for your critical loads?

The optimized Liebert STS2 safely meets both the CBEMA standard (prior to 1996) and the latest ITIC standard (1996) for critical loads. Liebert’s optimized

STS2 eliminates the risk of transformer saturation problems during automatic transfers, while its algorithm control ensures minimum voltage disturbance during transfers while still balancing the flux.

5

Image 5
Contents Liebert STS2 Static Transfer Switch2 Reliability Power to Protect Your Critical OperationsTrue Internal Redundancy One-Line Diagram Less floor space required for maintenance accessTrue Front-Access Design Figures 1 Load voltages Transformer fluxes Primary currentsLiebert’s transfer control does more than balance the flux Liebert STS2 Communication and Product Options Options and AccessoriesTotal Service Capability Critical Space Support from Emerson Network Power ServiceIon