Cisco Systems 2020 manual Hardware Installation

Page 1

C H A P T E R

2

Hardware Installation

This chapter provides procedures for installing a LightStream 2020 multiservice ATM switch (LS2020 switch) in a networking environment. Installing an LS2020 switch involves several tasks in two major categories:

1Installing the LS2020 switch hardware

Separate sections in this chapter are devoted to the following topics:

“Unpacking and Inspecting the LS2020 Switch Hardware”

“Installing an LS2020 Switch in Rack”

“Wiring a DC-Powered System”

“Installing Fantails”

“Attaching Data Cables”

“Closing the Chassis”

“Applying System Power”

2Performing basic configuration procedures

The basic configuration tasks for the LS2020 switch are accomplished through configuration scripts provided in this chapter.

Note Refer to the LightStream 2020 Release Notes for important, release-specific information that may not appear elsewhere in the LS2020 documentation set.

Unpacking and Inspecting the LS2020 Switch Hardware

When unpacking the LightStream 2020 switch, you should inspect the shipping container contents to ensure the shipment is complete as well as check for damage that may have occurred during shipment.

Step 1 Check the shipping container before removing the LS2020 switch hardware from the loading dock and inspect it for any signs of in-transit damage.

Step 2 Transport the container to the systems area where the LS2020 switch is to be installed.

Step 3 Cut the packing straps and lift the cardboard box off the LS2020 chassis. Remove the packing material and bill of materials.

Step 4 Check the bill of materials against the shipment received.

Hardware Installation 2-1

Image 1
Contents Unpacking and Inspecting the LS2020 Switch Hardware Hardware InstallationCooling Air and Hardware Placement Installing an LS2020 Switch in RackRack Installation Procedure Required ToolsInstalling an LS2020 Switch in Rack 2020 Rear View of AC-powered LightStream 2020 Chassis Preparation for Wiring Wiring a DC-Powered SystemConnections to DC-powered Chassis Wiring ProcedureRequired Tools and Equipment Installing FantailsFantail Cable Connections Fantail Installation ProcedureConnecting Cables Closing the Chassis Applying System PowerTerminal Power switch Block Power inlet Switch LightStream 2020 Power-up Sequence Installing ModemsBasic LS2020 Configuration Tasks PasswordsRequired Configuration Information IP Addresses and Masks Host NameTrunk Port Information Attaching a Terminal to a Console Port Setting Console/Modem Baud Rates through TCS Hub CommandsBackground Information For the Modem Port Method Attaching a Terminal and Matching the Baud Rate20LightStream 2020 Installation Guide Connecting the Terminal to the NP Special Consideration Running Scripts Separately Entering Configuration Data Second Enter date prompt confirms the initial date entry Host name LightStream1 26LightStream 2020 Installation Guide Host Name LightStream1 28LightStream 2020 Installation Guide Password password Return Running Diagnostics How to ProceedStarting Maintenance Log Installing StreamView Network Management SoftwareBacking Up Distribution Diskettes Configuring the NetworkIf Your PC Has Two 1.44-MB Floppy Disk Drives \ diskcopy a a /v If Your PC Has One 1.44-MB Floppy Disk Drive