Installing Fantails
Step 7 Repeat the procedure above if the LS2020 switch contains a second DC power tray.
Step 8 Observe the green power LED on the front of the power tray when power is applied. If the LED is not lit, check for incorrectly connected wires or problems in the DC power source.
Installing Fantails
This section explains how to mount and connect fantails in your LS2020 switch (see Figure
If your system has no
Required Tools and Equipment
Obtain the following equipment and tools in preparation for installing fantails:
•Fantails in the desired quantity (provided by Cisco Systems).
•Required fantail cables (provided by Cisco Systems).
•Fantail mounting screws, clip nuts, and washers (provided by Cisco Systems). If your equipment rack has
•
•
•
A
Adhesive labels for making appropriate notations on each fantail.
A grounding wrist strap for ESD protection during fantail installation.
Note If you are installing X.21 fantails and you plan to configure the ports as DTEs, you must obtain and install a