Q-Logic quick start Mount the Router, Install the SFPs, Apply Power to the SANbox 6142 Router

Page 5

Step 3. Mount the Router

Mount the SANbox 6142 using the shelf, if purchased.

Step 4. Install the SFPs

An SFP transceiver is required for each of the router’s FC ports that will be connected to a Fibre Channel device or switch. SFPs are included in the package.

To install an SFP transceiver, insert the transceiver into the router port and press gently until it snaps in place. The transceiver will fit only one way. If the transceiver does not install under gentle pressure, flip it over and try again.

Step 5. Apply Power to the SANbox 6142 Router

Figure 3 shows the location of the ports and LEDs on the SANbox 6142 Router.

MANAGEMENT PORT

HEARTBEAT LED

10/1000 ETHERNET

 

INPUT POWER LED

 

 

 

SYSTEM FAULT LED

 

 

 

FC

ISCSI

RS232

AC POWER

PORTS

PORTS

PORT

 

Figure 3. SANbox 6142 Ports and LEDs

Attach the AC power cord to the SANbox 6142 Router and then to the wall outlet or power strip. Verify that the router’s input power LED is illuminated. The Router first runs its self-test, which takes about one minute, then begins normal operation. Verify that the heartbeat LED is blinking (once per second) and that the system fault LED is not illuminated.

3

Image 5
Contents Quick Start Guide Support Headquarters Quick Start Guide Suggested ConfigurationsPre-installation Checklist Installation InstructionsVerify the Package Contents Mount the Router Install the SFPsApply Power to the SANbox 6142 Router Configure SANbox 6142 Management Port IP Address Install the SANsurfer Router ManagerFC 1 Wwpn FC 2 Wwpn Run the Configuration WizardConfiguration requirement Configuring SANbox 6142s for Connecting Remote SANsPage Warranty Troubleshooting and Technical SupportPage SN0054644-00B