Quick installation
This quick installation guide is provided to help the user to set up the switch in a short time. However, it is recommended that users read through this manual before trying installing the hardware.
After unpacking the switch, a suitable location must be found for it. Because this switch occupies a central location in the network, it is important to find a stable hori- zontal surface which is clear of electromagnetic interference and equipped with a power outlet.
Neither the switch nor any device should be powered on while installing network components.
Now the user needs to connect all devices that will directly interface with the new switch and with Category 5 UTP, Category 1 STP or equivalent cables. It is bet- ter to start from the
To uplink two switches together, connect both devices with a Category 5 UTP or Category 1 STP cable at maximum length of 100 meters. When uplinking, the con- nection can be made in port 8 via the switch on the rear panel to setup the position to X.
All the connections have to be checked and the correct location of cables should be verified. The switch and the connected devices can now be powered on. The switch will indicate all port connections by blinking the correspondent port indicators.