Paradyne ENE2020-P installation instructions LED Indicators, Led

Page 10

LED Indicators

This document describes units manufactured after 13 January 2005. See the prior version of this document for information about units manufactured on or before that date.

Whenever both ENE2020 E1 connections have lost link or have presented an E1 Alarm, the Ethernet link will automatically be disabled (as indicated by no illumination of the Ethernet 100, Act and Lnk LEDs). Upon reestablishment of at least one of the E1 connections, the Ethernet link will be reinstated and the Ethernet LEDs will reflect current Ethernet Status.

Table 6. LEDs (1 of 2)

LED

State

Indication

Additional Information

 

 

 

 

E1

Flashing*

E1 connection is

Traffic is flowing.

Connections

Green

established and active

 

Lnk (Port 1

 

 

 

Solid

Problematic E1

A connection exists but there

and Port 2)

Green

connection

is indication of a problem with

 

 

 

 

the E1 line.

 

 

 

 

 

No

Loss of Synchronization

If the outgoing connection

 

Illumination

(LOS)The incoming

from the unit has also been

 

 

connection to the unit

lost then the unit's partner

 

 

has been lost; no data is

ENE2020 will have LOS as

 

 

being received.

well.

 

 

 

 

E1

No

E1 is operational

An established E1 link has no

Connections

Illumination

 

alarm indications and is

Alm (Port 1

 

 

operational unless the E1 Lnk

and Port 2)

 

 

LED remains unlit as well, in

 

 

 

which case the ENE2020 has

 

 

 

LOS.

 

 

 

 

 

Solid

Remote Alarm Indication

The unit's partner ENE2020

 

Amber

(RAI)The outgoing

has lost its incoming

 

 

connection from the unit

connection and has LOS.

 

 

has been lost; no data is

 

 

 

being transmitted.

 

 

 

 

 

 

Pulsing*

Alarm Indication Signal

The unit's partner ENE2020

 

Amber

(AIS)An indirect

has lost a connection with an

 

 

connection has been

intermediate device and has

 

 

lost; the unit may no

LOS or RAI.

 

 

longer be receiving data

 

 

 

from its partner

 

 

 

ENE2020.

 

 

 

 

 

10

Image 10
Contents Contents Software and Firmware License AgreementPage Warranty, Sales, Service, and Training Information Package ContentsPowering Up the ENE2020 Configuring the E1 Ports Speed Frame TypeLine Code TimingLoop Bonded Connection Connecting the E1 LinesProcedure Single E1 ConnectionConnecting the Ethernet Line LED Indicators LEDLEDs 2 E1 RJ45 Pin Assignments RJ45 Pin AssignmentsEthernet RJ45 Pin Assignments United States EMI Notice EMI NoticesCanada EMI Notice Important Safety Instructions Page ENE2-A2-GN10-10