Paradyne ENE2020-P installation instructions Powering Up the ENE2020

Page 4

Powering Up the ENE2020

Plug the power supply into the power adapter port on the back of the ENE2020 and connect it to your power source.

Power

Adapter

10/100 Connection

5V DC

 

12 3 4 5 6 7 8 Port 2 Config

 

T1 or E1

Port 2

Port 1

 

1 2 3 4 5 6 7 8

Port 1 Config

04-17581

Verify that the Power LED on the front of the ENE2020 is illuminated.

Port 2

Port 1

Lnk

Alm

Power

E1 Connection

 

E1

Network Extender 2000

 

 

 

 

E

 

 

 

NE2020

100

Act

Lnk

10/100 Ethernet Connection

04-17580

NOTE: Upon start up, the Ethernet link will remain disabled (as indicated by no illumination of the Ethernet 100, Act and Lnk LEDs) until at least one of the two E1 connections has been established.

4

Image 4
Contents Contents Software and Firmware License AgreementPage Warranty, Sales, Service, and Training Information Package ContentsPowering Up the ENE2020 Configuring the E1 Ports Speed Frame TypeLine Code TimingConnecting the E1 Lines ProcedureLoop Bonded Connection Single E1 ConnectionConnecting the Ethernet Line LED Indicators LEDLEDs 2 E1 RJ45 Pin Assignments RJ45 Pin AssignmentsEthernet RJ45 Pin Assignments United States EMI Notice EMI NoticesCanada EMI Notice Important Safety Instructions Page ENE2-A2-GN10-10