TM
ACCULINK 3165 DSU/CSU
Quick Reference
Document Number
January 1998
Quick Start Procedure
The following procedure is for experienced DSU/CSU users who are familiar with the 3165 DSU/CSU installation process and have no special requirements for their application. See the ACCULINK 316x Data Service Unit/Channel Service Unit Operator's Guide (Document No.
1.Attach the power cord to the rear of the DSU/CSU and the other end to a grounded 115 Vac power outlet.
2.Attach the 3165 DSU/CSU network connection to the T1 network using the appropriate cable. Attach the 3165 DSU/CSU to the customer premises equipment via the port connector.
3.Power on the DSU/CSU to perform the
4.If you intend to use front panel emulation, connect the cable from the PC to the COM port on the rear panel of the DSU/CSU.
5.If you intend to manage the 3165 DSU/CSU with SNMP, cable either the COM or MODEM port (as appropriate for your configuration). Then, configure the SNMP management link.
6.The Factory 1 configuration for ESF framing format and B8ZS line coding format is the default configuration and is appropriate for most networks. If this configuration does not work for you, try the Factory 2 configuration for D4 framing format and AMI line coding format. To further customize configuration options, refer to Changing Configuration Options in Chapter 3, Operation, and to Appendix C, Configuration Options, in the ACCULINK 316x Data Service Unit/Channel Service Unit Operator's Guide.
7.During the
1