PATTON ELECTRONICS CO. | INSTALLATION AND OPERATIONS MANUAL |
137001UA
Caution, Disconnect the POWER Before Removing The Cover. Vorsicht, Befor Deckung Abnehmen Mach Strom Zu.
CHAPTER 2 - SETUP AND INSTALLATION
Power Connection
Before connecting the MSD to an AC power source the top cover must be installed and secured with the supplied screws. The unit is supplied with a 110/220V voltage switch. Turn the switch with a coin or
screw driver to the appropriate voltage | 110 / 220VA Switch |
| |
for your country. EXAMPLE: United | Fuse Drawer |
States of America, set to 110V. The |
|
unit is supplied with an IEC power | 110 |
connector next to the voltage select | 220 |
| |
switch. Plug the power cord into the |
|
connector until it is firmly seated. You |
|
may now connect the power cord |
|
into your AC outlet. | IEC Power Connector |
Factory Configuration Switch Settings
The MSDs are configured prior to shipment with the switches set to the following default positions:
3012/V24 (CTS MSD-2C)
Switch 3 - positions 4, 5 and 6 to OFF, 1, 2 and 3 to ON
CTS Delay = No Delay
Signal Ground not connected to Chassis Ground
JP4 and JP5 to IN
Provide Pin 9 and 10 Test Voltage
JP1, JP2, and JP3 to IN
Factory Testing Straps Must be installed
3014/V24 (CTS MSD-4C)
Switch 5 - positions 4 and 6 to OFF, 1, 2, 3 and 5 to ON
Switching Mode = Priority
Signal Ground not connected to Chassis Ground
Setup & Installation |