TP-Link TL-SG2424, TL-SG2216 Equipotential Bonding, Connecting to the Ground via the Power Supply

Page 16

Gigabit Smart Switch

Note: The grounding bar and the ground cable are not provided with our product. If needed, please self purchase them.

Connecting to the Ground via the Power Supply

If the device is installed in the normal environment, the device can be grounded via the PE (Protecting Earth\ cable of the AC power supply as shown in the following figure.

FFFFFFFFFFF Connecting to the Ground

Note:

The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above.

If you intend to connect the device to the ground via the PE (Protecting Earth\ cable of AC power cord, please make sure the PE (Protecting Earth\ cable in the electrical outlet is well grounded in advance.

3333 Equipotential Bonding

Equipotential Bonding is the practice of intentionally electrically connecting all earthed systems to the same grounding grid or connecting the grounding grids of all the earthed systems together through the ground or overground metal so as to create an earthed equipotential zone. When lightning occurs, the high voltage produced by lightning current in all systems will meanwhile exist in their ground cables, and thus all ground cables have the same electrical potential and basically eliminate the electric strikes between the systems.

The figure below illustrates how to practice equipotential bonding in a network.

12 Lightning Protection

Image 16
Contents Installation Guide Copyright & Trademarks FCC Statement CE Mark WarningAudience Related Document About this Installation GuideConventions Contents Cccccccccc Introduction Product OverviewAppearance Front PanelReset Rear PanelGrounding Terminal Package Contents CCCCCCCCCCInstallationSafety Precautions Temperature/Humidity Site RequirementsInstallation Tools Lightning ProtectionDesktop Installation Product InstallationRack Installation Fffffffffff Rack Installation Cabling Reasonably Cccccccccc Lightning ProtectionRequirements for Cabling Outdoors Requirements for Cabling Indoors Connecting to the Grounding Bar Connect to GroundConnecting to the Ground via the Power Supply Equipotential BondingUse Lightning Arrester Fffffffffff Lighting Arrester Connection Ethernet Port CCCCCCCCCCConnectionSFP Port Power On Verify InstallationInitialization CCCCCCCCCCCConfiguration Configure the Switch via GUIConfigure the Switch Using CLI Gigabit Smart Switch Appendix a Troubleshooting Qqqq Why does the Power LED work abnormally?Appendix B Hardware Specifications Appendix C Technical Support Service time Monday to Friday 900 AM to 600 PM Mail support@tp-link.com 7106503902 Rev
Related manuals
Manual 32 pages 25.6 Kb