BenQ PE8720 manual Step B, Step C, Step D

Page 6

STEP B

Install the TUBE and the U-PLATE with 2 sets of BOLTS & NUTS (TUBE BOLT).

NUTS x 2

TUBE BOLTS x 2

TUBE

STEP C

Install the PIPE and the TUBE with 2 sets of BOLTS & NUTS (L-ADJUST BOLT).

NUTS x 2

L-ADJUST BOLTS x2

PIPE

STEP D

Install the base-assembly.

STEP D1 Combine the SQUARE TUBE and the

STEP D2 Install the ADJUSTMENT ASSEMBLY to the

PIPE with 2 BOLTS.

SQUARE TUBE with one BOLT and 2 M3 SCREWS.

BOLT

M3 SCREWS

6 Installing a Projector with the Ceiling Bracket

Image 6
Contents Welcome Copyright Packing Parts List Names of PartsProjector Installation and Throw Distance Chart Installation for a 43 screenInstalling a Projector with the Ceiling Bracket Installation ProcedureStep a Step B Step CStep D Step E Step FAdjusting the Ceiling Bracket Height AdjustmentHorizontal Angle Adjustment Vertical Angle AdjustmentSwing Adjustment Specifications and Diagrams SpecificationsDiagrams