InFocus LP750 manual Install the base box to the LiteMount False Ceiling Plate

Page 6

I n s t a l l t h e C e i l i n g M o u n t B a s e B o x o n t h e C e i l i n g

3Place the ceiling plate or pipe extension in the ceiling so that the base box hangs down into the room.

4Route the projector’s cables through your ceiling and out the hole in the ceiling.

WARNING: If the dropped ceiling is an air- handling plenum, be sure the cables are plenum- rated, or install the cables within conduit.

make sure this surface faces front

FIGURE 1

Install the base box to the LiteMount False Ceiling Plate

4

Image 6
Contents Installation Guide Page Ceiling Mount Installation Guide Additional LiteMount ProductsContents Placing the ProjectorInstall the Ceiling Mount Base Box on the Ceiling Install the base box to the LiteMount False Ceiling Plate Install the base box to the LiteMount Pipe Tubing Extension Attach the Mounting Plate to the Projector Hang the Projector on the Ceiling N g t h e P r o j e c t o r o n t h e C e i l i n g Page Adjusting the Image Inverting the ImageLimited Warranty Warranty Limitation and ExclusionPage Installationsanleitung FÜR DIE Deckenbefestigung LiteMount-ZusatzproduktePlazierung des Projektors LieferumfangDen Deckenbefestigungssockel an der Decke montieren E f e r u m f a n g Befestigung des Sockels an der LiteMount-Rohrverlängerung Die Montageplatte am Projektor befestigen Den Projektor an der Decke aufhängen Befestigung des Projektors am Deckensockel Page DAS Bild Einstellen Das Bild invertierenEingeschränkte Garantie Einschränkung und Ausschluß der Garantie