Fisher LNS-W10 manual Mount the Light-Block Sheet Base, Mount the Top Cabinet and the Lens Cover

Page 4

5

Mount the Light-Block Sheet Base

Mount the Light-Block Sheet Base.

LIGHT-BLOCK

SHEET BASE

HOOKS

LIGHT-BLOCK

SHEET

Light-Block Sheet should be located under the hooks.

HOOKS

Fig-5

6

Mount the Top Cabinet and the Lens Cover

For the Cabinet Fig. 6-1

1.Mount the Top Cabinet with 2 screws.

2.Mount the Lens Cover.

Position the mark "UP" of the Lens Cover on top and push into the cabinet. Turn the Lens Cover clockwise until it is securely locked.

For the Cabinet Fig. 6-2

UP

1.Mount the top cabinet with 2 screws.

2.Push into the Lens Cover to the Top Cabinet.

Confirm the top and bottom of the lens cover. The part circled in Fig-6-2 should be fitted.

Turn the projector on and check Lens shift, Zoom and Focus is operating properly.

If Light-Block Sheet interfere with those operations, check if the Light-Block Sheet is set properly.

Fig-6-1

Fig-6-2

-4-

Image 4
Contents LNS-T10/LNS-W10 Remove the Lens Cover and the Top Cabinet Fig-1-1Fig-1-2 Remove the Light-Block Sheet BaseRemove the Lens Fig-3Fig-4 Mount the LensMount the Light-Block Sheet Base Mount the Top Cabinet and the Lens CoverFig-6-1 Fig-6-2 For the Cabinet Figレンズ交換作業手順書 レンズカバー及び上面キャビネットを外す。 レンズ交換は の手順で行います。遮光プレートベースを外す。 レンズを外す。 レンズを取り付ける。遮光プレートベースを取り付ける。 上面キャビネット及びレンズカバーを取り付ける。6ー1のキャビネットの場合 6ー 2 のキャビネットの場合