Quick Install Guide | 7 |
When inserting a switch controller, take care to slide the
Figure 4: Card guides on the SwitchBlade 8 chassis.
bottom controller guide
Figure 5: Ejector lever and locking slot.
Extractor lever
9.Secure the switch controller
Move the ejector levers to the locked position (see Figure 3 on page
10.Check the switch controller is receiving power
The switch controller’s Power LED will light green if the controller is receiving power.
If the power LED fails to light:
For AC chassis models, ensure that:
•The IEC power cords are plugged into the correct sockets on the chassis’s rear panel. The sockets should correspond to PSU bays that have PSUs installed.
•The IEC power cords are plugged into supply circuits that are receiving power and all switches are in the ON position.
•The standby switch on the chassis is in the Run position