Allied Telesis Switch Controller manual Dimm

Page 5

Quick Install Guide

5

Figure 1: ESD socket on the SwitchBlade 8 chassis.

ESD socket

5.Install the CPU memory pack

Only Allied Telesyn supplied DIMMS have been tested and approved for use with SwitchBlade switch controllers. Using DIMM that has not been approved may cause unreliable operation and will invalidate the switch controller’s warranty.

In an antistatic environment:

a)Lay the switch controller on a flat surface

b)Unpack the memory pack’s two DIMMs

c)Holding a DIMM at an angle of about 30 degrees from horizontal, align the notches on its connector strip with the notches on a DIMM slot (see Figure 2 on page -5)

d)Insert the DIMM into the DIMM slot, sliding it along the two guides until the retaining latches click into place. The latches should hold the DIMM firmly in place

e)Repeat the process for the second DIMM

For the switch to function, both DIMMs must be installed (giving 256 MBytes of

DRAM per switch controller).

Figure 2: Installing DIMM on the AT-SB4211 Switch Controller.

DIMM

DIMM slot

6.Install CAM

If you purchased Content Addressable Memory (CAM) modules, install them now by following the instructions in the CAM Quick Install Guide.

The CAM Quick Install Guide can be found on the SwitchBlade Documentation and Tools CD-ROM, or can be downloaded from www.alliedtelesyn.co.nz.

C613-04031-01 REV B

Image 5
Contents Switchblade Switch Controller Page Models Covered By This Guide Package ContentsFollow these steps to install a switch controller Installing a Switch ControllerDimm To remove a bay’s faceplate To remove an existing switch controllerFor AC chassis models, ensure that Extractor leverFor DC chassis models, ensure that Configuring The Switch ControllerUsing the CLI to configure a switch controller Using the GUI to configure a switch controller Click on the Help Button Help on each LED Switch Controller LEDsDocumentation And Tools CD-ROM