Allied Telesis AT-GS950/48 manual Eco-friendly Switch, Action Results

Page 21

AT-GS950/48 Gigabit Ethernet WebSmart Switch Installation Guide

Eco-friendly Switch

The eco-friendly switch on the front panel is multifunctional and shown in Figure 2. It may be used to conserve power by turning off the port LEDs, reset the switch, or reset the switch configuration to the factory default settings. The switch functions are described in Table 2.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1745

 

 

 

 

 

 

 

 

 

Figure 2. Eco-friendly Switch

Table 2. Eco-friendly Switch Functions

 

 

 

 

Action

Results

 

 

 

 

 

 

 

 

Momentarily press the

Enable or disable all front panel LEDs with the

switch.

exception of the POWER LED which remains

 

active at all times.

 

 

 

 

Hold the switch down for

Reset the switch.

more than 5 seconds, but

 

 

 

 

 

less than 10 seconds.

 

 

 

 

 

 

 

 

 

Hold the switch down for

Reset the switch and reset the configuration to

more than 10 seconds.

the factory default settings.

 

 

 

 

 

 

21

Image 21 Contents
Installation Guide Page Electrical Safety and Emissions Standards Translated Safety Statements Contents Page Figures Figures Tables Tables Preface Symbol Meaning Description Safety Symbols Used in this DocumentWhere to Find Web-based Guides Contacting Allied Telesis Management Software Updates Preface Chapter OverviewFeatures AT-GS950/48 Front and Back Panels Front and Back PanelsUplink Combo Ports PortsAction Results Eco-friendly SwitchState Description LEDsLED Power Supply MAC Address Table Ethernet Switching BasicsDuplex Mode Store Forward Page Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Speed Type of Cable Operating Distance Cable SpecificationsUnpacking the Switch Installing the Switch on a Desktop Installing the Switch on a Wall Positioning and Drilling Holes for Wall Installation Positioning the Switch onto the Wall with Mounting Screws Installing the Switch in a Rack 1748 1749 Installing an SFP Transceiver 1752 Connecting Twisted Pair Cables Cabling and Powering On the SwitchConnecting Fiber Optic Cables Powering On the Switch Starting a Management Session Installation Troubleshooting Troubleshooting Physical Specifications Technical SpecificationsEnvironmental Specifications Power SpecificationsNetwork Protocol and Standards Compatibility Safety and Electromagnetic Emissions CertificationsPin Signal Connectors and Port PinoutsPin Pair Signal Appendix B Cleaning Fiber Optic ConnectorsRubbing the Ferrule Tip on the Cleaning Surface Using a Cartridge-Type CleanerPage Cleaning a Recessed Ferrule If desired, repeat step Using a SwabPage Appendix B Cleaning Fiber Optic Connectors
Related manuals
Manual 2 pages 50.79 Kb