ADIC manual FastStor 1 Quick Installation Guide

Page 7

Attention: The FastStor 1 is designed to operate in a horizontal position. Do not attempt to operate the FastStor 1 in any position other than horizontally. Also make sure that:

The airflow around the front and back of the FastStor 1 is not obstructed.

There is a minimum of 60cm free space in front of the unit to allow the operator to safely remove the magazines.

The display and operator controls are easily accessed.

The FastStor 1 is situated away from the floor and in a clean environment with temperatures within specifications.

The Rack Mounting Kit includes the following items:

Rail Left Assembly

Rail Right Assembly

Screw M6x12 (4 pieces)

Screw M5x8 (2 pieces)

Screw M4x12 (4 pieces)

Nut M4 Hex (4 pieces)

Washer to M6 (4 pieces)

Washer to M4 (4 pieces)

Recommended mounting tools:

Folding rule or tape measure

Phillips #2 screwdriver

7 mm open-end wrench

Note: The rails are mounted to the loader during transportation. Before mounting the rails into the rack, dismount the rails from the loader and remove the spacers between the rails and the loader.

FastStor 1 Quick Installation Guide

3

Image 7
Contents FastStor 1 Quick Installation Guide Adic USA Table of Contents Page Introduction Unpacking the FastStor Installing the FastStor 1 in a RackFastStor 1 Quick Installation Guide Installing the Rack Mounting Kit Installing the Rail Left Assembly Mounting the FastStor 1 to the Rack Fasten the rear of the FastStor 1 to the rails Connecting Power CableRemoving the Transport Lock Running Power-On SelftestConnecting the Scsi Bus Cable Setting the Scsi AddressScsi cable and Scsi terminator connection Restarting Your System Connecting the Ethernet ConnectorBCR Labeling cartridges