INSTALLATION INSTRUCTIONS PN79G

CABLE REQUIREMENT: Terminates most 22-26 AWG solid or stranded

IWC wire with a .050" (1.27mm) max. o.d., either PVC or Plenum rated.

5.To help contain cross-connections, install vertical cable managers (P110VCM300 for 300 pair and PV110CM900 for 900 pair) adjacent to towers using #12 wood screws (not provided) or equivalent.

Attach horizontal cable manager trough to towers and vertical cable managers using #12 sheet metal screws and #12 external tooth lockwashers (provided). Fasten securely to assure grounding. Attach ground lug (P/N:LAM2A2/0-14-6) with 1/4" x 3/4" machine screw, nut, and 1/4" external tooth lockwasher (provided), to the bottom of the horizontal cable manager trough.

 

 

 

 

Component Quantity per Tower System

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Base

Trough

 

Connecting Blocks

 

Label Holders

Labels

 

 

 

 

 

 

 

 

 

 

Part Number

P110B100

P110JT

P110CB3

P110CB4

P110CB5

P110CB4IG

P110CB5IG

P110LH

DSL110

 

 

 

 

 

 

 

 

 

 

 

P110KT3004

3

3

-

60

12

-

 

-

6

6

 

 

 

 

 

 

 

 

 

 

 

P110KT3005

3

3

-

-

60

-

 

-

6

6

 

 

 

 

 

 

 

 

 

 

 

P110KT9004

9

9

-

180

36

-

 

-

18

18

 

 

 

 

 

 

 

 

 

 

 

P110KT9005

9

9

-

-

180

-

 

-

18

18

 

 

 

 

 

 

 

 

 

 

 

INSTALLATION TIPS:

1.PAN-PUNCHproduct terminates most 22-26 AWG solid or stranded IWC wire with a .050" (1.27mm) max. o.d., either PVC or Plenum rated.

2.Never install wire into a slot previously used for a larger gauge.

3.Be careful to strip back cable jacket only as required for termination.

4.Use care to maintain pair twists to within 0.5" (13mm) of the termination strip.

5.When stripping cable jacket, be careful not to cut the insulation on the individual wires.

6.Avoid sharp bends when routing cable.

As with all Wiring Accessories, the following statements apply:

1.Never install communications wiring during a lightning storm.

2.Never install communications wiring in wet locations unless the product is specifically designed for use in wet locations.

3.Never touch uninsulated communications wiring or terminals unless the communication line has been disconnected at the network interface.

4.Use caution when installing or modifying communication wiring.

For Instructions in Local Languages

and Technical Support:

www.panduit.com/resources/install_maintain.asp