PAN-PUNCH 110 Tower System
© Panduit Corp. 2007
INSTALLATION INSTRUCTIONS PN79G
CABLE REQUIREMENT: Terminates most
IWC wire with a .050" (1.27mm) max. o.d., either PVC or Plenum rated.
NOTE: 300 PAIR TOWER SHOWN. INSTRUCTIONS ALSO APPLY TO THE 900 PAIR TOWER.
1. Mount tower to wall using #12 wood screws (not provided) or | 2. Route cable bundle into tower and fan out individual cables into |
equivalent. Some applications will require different mounting | their appropriate positions through the cutouts provided along the |
hardware. Ensure that the bottom of the tower is at least 8" from | tower leaving 12" to 18" of slack. Each cutout accommodates up |
the floor to provide space for horizontal cable manager trough. | to 25 pair. Use cable ties to secure bundle to raised tabs on back |
| of tower. |
3. Position base over slots in tower and secure with two #12 | 4. Install jumper troughs between bases with two #12 sheet metal |
sheet metal screws (supplied). Place conductors into index | screws (supplied). |
strip and install connecting blocks as per instruction sheet |
|
PN51* (provided). |
|
SCREW HERE
SCREW HERE
* Denotes instruction sheet revision letter.
For Technical Support: www.panduit.com/resources/install_maintain.asp
Page 1 of 2