SUPER MICRO Computer SC502-200B user manual Rack Precautions, General Server Precautions

Page 30

SC502 Chassis Manual

This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and similar environments).

!Warnings and Precautions!

Rack Precautions

!

Ensure that the leveling jacks on the bottom of the rack are fully extended to the floor with the full weight of the rack resting on them.

In single rack installation, stabilizers should be attached to the rack.

In multiple rack installations, the racks should be coupled together.

Always make sure the rack is stable before extending a component from the rack.

You should extend only one component at a time. Extending two or more simul- taneously may cause the rack to become unstable.

General Server Precautions

Review the electrical and general safety precautions that came with the com- ponents you are adding to your chassis.

Determine the placement of each component in the rack.

Install the heaviest server components on the bottom of the rack first, and then work up.

Use a regulating, uninterruptible power supply (UPS) to protect the server from power surges, voltage spikes and to keep your system operating in case of a power failure.

Allow the hard drives and power supply modules to cool before touching them.

Always keep the rack's front door, all panels and all components on the servers closed when not servicing, in order to maintain proper cooling.

5-2

Image 30 Contents
Super SC502-200B Chassis Manual Preface About This ManualManual Organization IntroductionTable of Contents Page Shipping List Chapter IntroductionOverview Part Numbers SC502-200B ChassisWhere to get Replacement Components Europe Contacting SuperMicroHeadquarters Asia-PacificSC502 Chassis Manual Chapter System Safety Preparing for SetupElectrical Safety Precautions System Safety Page Components Power SupplyChapter Chassis Components ChassisWhere to get Replacement Components Chapter Chassis Setup and Maintenance Removing the Chassis Cover Removing the Chassis CoverInstalling the Hard Drives Installing the 2.5 Hard DrivesInstalling the Motherboard Chassis StandoffsMotherboard Installation Add-on Card/Expansion Slot Setup Add-on Card ClipReplace the Add-on Card Installing the Heatsink Installing the Heatsink10 Installing an Active Heatsink Checking the Servers Air Flow Power Supply Replacing the Power SupplyPage SC502 Chassis Manual Chapter Rack Installation Choosing a Setup LocationUnpacking the System Rack Precautions General Server PrecautionsAmbient Operating Temperature Rack Mounting ConsiderationsInstalling the Chassis into a Rack Rack Mounting InstructionsInstalling the Chassis into a Telco Rack Mid-Mount Telco RackSC502 Chassis Manual Overview Cables Included with SC502 Chassis Appendix a Cables, Screws Other AccessoriesOptional Accessories Hard Drive Carrier TrayExtending Power Cables 1U Active Heatsink SNK-P0032A4Front Panel to the Motherboard Chassis Screws Hard DriveSC502 Chassis Manual Appendix B Power Supply Specifications SC502 Chassis Manual