SUPER MICRO Computer SC502-200B Rack Mounting Considerations, Ambient Operating Temperature

Page 31

Chapter 5: Rack Installation

Rack Mounting Considerations

Ambient Operating Temperature

If installed in a closed or multi-unit rack assembly, the ambient operating tempera- ture of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient tempera- ture (TMRA).

Reduced Airflow

Equipment should be mounted into a rack so that the amount of airflow required for safe operation is not compromised.

Mechanical Loading

Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.

Circuit Overloading

Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.

Reliable Ground

A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connec- tions other than the direct connections to the branch circuit (for example, the use of power strips, and other devices).

5-3

Image 31 Contents
Super SC502-200B Chassis Manual About This Manual PrefaceIntroduction Manual OrganizationTable of Contents Page Part Numbers SC502-200B Chassis Chapter IntroductionOverview Shipping ListWhere to get Replacement Components Asia-Pacific Contacting SuperMicroHeadquarters EuropeSC502 Chassis Manual Preparing for Setup Chapter System SafetyElectrical Safety Precautions System Safety Page Chassis Power SupplyChapter Chassis Components ComponentsWhere to get Replacement Components Chapter Chassis Setup and Maintenance Removing the Chassis Cover Removing the Chassis CoverInstalling the 2.5 Hard Drives Installing the Hard DrivesChassis Standoffs Installing the MotherboardMotherboard Installation Add-on Card Clip Add-on Card/Expansion Slot SetupReplace the Add-on Card Installing the Heatsink Installing the HeatsinkChecking the Servers Air Flow 10 Installing an Active HeatsinkReplacing the Power Supply Power SupplyPage SC502 Chassis Manual Choosing a Setup Location Chapter Rack InstallationUnpacking the System General Server Precautions Rack PrecautionsRack Mounting Considerations Ambient Operating TemperatureRack Mounting Instructions Installing the Chassis into a RackMid-Mount Telco Rack Installing the Chassis into a Telco RackSC502 Chassis Manual Hard Drive Carrier Tray Appendix a Cables, Screws Other AccessoriesOptional Accessories Overview Cables Included with SC502 Chassis1U Active Heatsink SNK-P0032A4 Extending Power CablesFront Panel to the Motherboard Hard Drive Chassis ScrewsSC502 Chassis Manual Appendix B Power Supply Specifications SC502 Chassis Manual