EZ Switch 10/100/1000
INSTALLING
THE SWITCH
Before installing the switch, verify that you have all the items listed under “Package Contents.” If any of the items are missing or damaged, contact your local SMC distributor. Also be sure you have all the necessary tools and cabling before installing the switch.
Package Checklist
The EZ Switch 10/100/100 package includes:
•The EZ Switch 10/100/1000 (SMCGS5 or SMCGS8)
•Four rubber feet
•Appropriate DC power adapter
•SMC Warranty Registration Card
•This User Guide
Please register this product and upgrade the product warranty at www.smc.com.
Selecting a Site
Be sure to follow the site selection guidelines below when choosing a location:
•Select a suitable location for the switch:
•It should be accessible for installing, cabling and maintaining the switch.
•The temperature and humidity should be within the ranges listed in the specifications.
•The status LEDs should be clearly visible.
•There should be adequate space (approximately two inches) on all sides for proper air flow.
•The status LEDs should be clearly visible.
4