SMC Networks 24/16 manual Installing the Switch, Equipment Checklist, Selecting a Site

Page 18

INSTALLING THE SWITCH

INSTALLING THE SWITCH

The EZ Switch 10/100 can be placed on a desktop or shelf, or installed in a standard 19-inch equipment rack.

Equipment Checklist

After unpacking the EZ Switch 10/100, check the contents of the box to be sure you have received the following components:

EZ Switch 10/100 SMC-EZ1024FDT or SMC-EZ1016FDT

Appropriate AC power cable

Rackmount kit

Four adhesive foot pads

SMC Warranty Registration Card

This User Guide

Selecting a Site

Be sure to follow the site selection guidelines below when choosing a location:

￿Select a suitable location for the switch:

It should be accessible for installing, cabling and maintaining the switch.

The temperature and humidity should be within the ranges listed in the specifications.

The status LEDs should be clearly visible.

There should be adequate space (approximately two inches) on all sides for proper air flow.

7

Image 18
Contents EZ Switch 10/100 EZ Switch 10/100 User Guide Copyright TrademarksLimited Warranty Limited Warranty Compliances FCC Class aIndustry Canada Class a Iii Compliances Table of Contents Table of Contents EZ Switch 10/100 AboutFeatures and Benefits Front Panel LEDs LEDRear Panel Connecting to a Fiber Optic Port Fiber transceiver Optical Maximum Cable Length Wavelength Installing the Switch Equipment ChecklistSelecting a Site Installing the Switch Instructions Installing the Switch Sample Applications Troubleshooting Possible SolutionsCable Specification CablesRJ-45 Connector Pin Assignments Specifications EZ Switch 10/100Size Fiber Uplink Modules 802.3uSpecifications Page Internet