SMC Networks 24/16 manual Installing the Switch

Page 19

INSTALLING THE SWITCH

￿Before rack mounting the switch, pay particular attention to the following factors:

Temperature: Since the temperature within a rack assembly may be higher than the ambient room temperature, check that the rack-environment temperature is within the specified operating temperature range.

Mechanical Loading: Do not place any equipment on top of a rack-mounted switch.

Circuit Overloading: Be sure that the supply circuit to the rack assembly is not overloaded.

Grounding: Rack-mounted equipment should be properly grounded. Particular attention should be given to supply connections other than direct connections to the mains.

￿Make sure twisted-pair cable is always routed away from power lines, fluorescent lighting fixtures and other sources of electrical interference such as radios and transmitters.

￿Make sure that a properly grounded power outlet is within 8 feet (2.44 meters) of the switch and is powered from an independent circuit breaker. As with any equipment, using a filter or surge suppressor is recommended.

8

Image 19
Contents EZ Switch 10/100 EZ Switch 10/100 User Guide Trademarks CopyrightLimited Warranty Limited Warranty FCC Class a CompliancesIndustry Canada Class a Iii Compliances Table of Contents Table of Contents About EZ Switch 10/100Features and Benefits LED Front Panel LEDsRear Panel Connecting to a Fiber Optic Port Fiber transceiver Optical Maximum Cable Length Wavelength Equipment Checklist Installing the SwitchSelecting a Site Installing the Switch Instructions Installing the Switch Sample Applications Possible Solutions TroubleshootingCables Cable SpecificationRJ-45 Connector Pin Assignments EZ Switch 10/100 SpecificationsSize 802.3u Fiber Uplink ModulesSpecifications Page Internet