Installation
Installation (continued)
3.Trim wires to 7/16 inch as shown in the adjacent diagram.
4.Connect the BLACK wire of the HA14WD switch to the 120V HOT building wire (the wire leading to the circuit breaker or fuse box,) using a twist connector (provided.)
NOTE: Insert wires straight into the twist connector, the twist clockwise. Make sure all twist connectors are tight. Secure each twist connector with electrical tape. Verify no bare wire shows below the wire connector.
5A. FOR SINGLE POLE APPLICATION ONLY: Connect the BLUE wire of the HA14WD to the LOAD wire using a twist connector (provided.)
5B. FOR 2, 3, and 4 SWITCH, and
NOTE: An additional wire run may be necessary in
6.Connect the ground wire from the box to the bare copper wire on the HA14WD switch. If there is no ground wire, connect the bare copper wire of the HA14WD to the wall box if it is metal. If the wall box is plastic, connect the bare copper wire to ground as supplied or consult with a qualified electrician.
7A. FOR SINGLE POLE APPLICATION ONLY: Remove the
7B. FOR 2, 3, and 4 SWITCH, and
8.Tuck wires into wall box leaving room for the HA14WD unit. For testing purposes, partially screw mounting screws (provided) of the HA14WD into the wall box.
9. Restore electrical power to the circuit.
NOTE: Before operating the switch, be sure the |
|
slide switch located below the rocker switch) is in the ON position. |
|
The switch is in the ON position if the vertical line (ON symbol) is |
|
visible to the right of the | ON |
| Indicator |
4
NOTE: When changing a light bulb, slide the
INSTALLATION INSTRUCTIONS CONTINUED ON NEXT PAGE...
OFF Indicator