Generac Power Systems 04635-0 owner manual Functional Tests Adjustments, Manual Operation

Page 7

Section 3 — Operation

Generac GTS “W” Type Transfer Switch

3.1FUNCTIONAL TESTS AND

ADJUSTMENTS

Following transfer switch installation and interconnection, inspect the entire installation carefully. A competent, qualified electrician should inspect it. The installation should comply strictly with all applicable codes, standards, and regulations. When absolutely certain the installation is proper and correct, complete a functional test of the system.

Perform functional tests in the exact order

!presented in this manual, or the switch could be damaged.

IMPORTANT: Before proceeding with functional tests, read and make sure all instructions and information in this section is understood. Also read the information and instructions of labels and decals affixed to the switch. Note any options or accessories that might be installed and review their operation.

3.2MANUAL OPERATION

DANGER

Do NOT manually transfer under load.

!Disconnect transfer switch from all power sources by approved means, such as a main circuit breaker(s).

A manual HANDLE is shipped with the transfer switch. Manual operation must be checked BEFORE the transfer switch is operated electrically. To check manual operation, proceed as follows:

1.Turn the generator’s AUTO-OFF-MANUAL switch to OFF.

2.Turn OFF both UTILITY and EMERGENCY power supplies to the transfer switch, with whatever means provided (such as the main line circuit breakers).

3.Note position of transfer mechanism main contacts by observing display windows in “A” and “B” in Figure 3.1 as follows:

Window “A” ON, Window “B” OFF - LOAD terminals (T1, T2) are connected to UTILITY terminals (N1, N2).

Figure 3.1 — Actuating Transfer Switch

Generac® Power Systems, Inc. 5

Image 7
Contents Power SYSTEMS, INC General Hazards Table of Contents Introduction Transfer Switch Enclosure Equipment DescriptionTransfer Switch Data Decal Safe USE of Transfer SwitchMounting Introduction to InstallationConnecting Power Source and Load Lines UnpackingAuxiliary Contacts Connecting Start Circuit WiresManual Operation Functional Tests AdjustmentsClose to Normal Source Side Voltage ChecksDo not Overload Generator Tests Under LoadAre in Millimeters N1 N2 N3 T1 T2 T3 CB1 Electrical Data Exploded Views and Parts List QTY Description Warranty Schedule