CyberPower Systems CPS1250AVR user manual Expected Runtime in Minutes, Replacing the Battery

Page 11

EXPECTED RUNTIME IN MINUTES

Desktop PC with 15” Monitor

72

- 100

Desktop PC with 17” Monitor

56

- 80

Desktop PC with 21” Monitor

45

– 65

Tower PC with 21” Monitor

40

- 60

CPS1250AVR

Guaranteed Uninterruptible Power System

REPLACING THE BATTERY

CAUTION! Read and follow the IMPORTANT SAFETY INSTRUCTIONS before servicing the battery. Service the battery under the supervision of personnel knowledgeable of batteries and their precautions.

CAUTION! Use only the specified type of battery. See your dealer for replacement batteries.

CAUTION! The battery may present risk of electrical shock. Do not dispose of battery in a fire, as it may explode. Follow all local ordinances regarding proper disposal of batteries.

CAUTION! Do not open or mutilate the batteries. Released electrolyte is harmful to skin and eyes and may be toxic.

CAUTION! A battery can present a high risk of short circuit current and electrical shock. Take the following precautions before replacing the battery:

1.Remove all watches, rings or other metal objects.

2.Only use tools with insulated handles.

3.Do not lay tools or metal parts on top of battery or any terminals.

4.Wear rubber gloves and boots.

5.Determine if the battery is inadvertently grounded. If inadvertently grounded, remove source of ground. CONTACT WITH GROUNDED BATTERY CAN RESULT IN ELECTRICAL SHOCK! The likelihood of such shock will be reduced if such grounds are removed during installation and maintenance (applicable to a UPS and a remote battery supply not having a grounded circuit).

TO REPLACE THE BATTERY

1.Turn off and unplug all connected equipment.

2.Turn the UPS off and unplug it from the AC power source.

3.Turn the UPS upside down.

4.Remove the 6 retaining screws.

5.Turn the UPS right side up and remove the outlet cover.

6.Remove the battery from the compartment.

7.Disconnect the battery wires from the battery.

8.Install the replacement battery by connecting the red wire to the positive (+) terminal of the battery and connecting the black wire to the negative (-) terminal of the battery.

9.Slide the battery back into the compartment.

10.Replace the outlet cover and the 6 retaining screws.

11.Recharge the unit for 4 – 8 hours to ensure the UPS performs expected runtime.

REMINDER: Batteries are consider HAZARDOUS WASTE and must be disposed of properly. Contact your local government for more information about proper disposal and recycling of batteries.

9

Image 11
Contents CPS1250AVR Automatic Voltage Regulator Table of ContentsWhat is AVR? Inspection HOW to Determine the Power Requirements of Your EquipmentTo Estimate Power Requirements Hardware Installation Guide For Windows Powerpanel Plus Software Installation GuideFor Windows NT Version This shows the hardware version Powerpanel Plus Main MenuPowerpanel Plus Main Window Description OverviewPowerpanel Plus Advanced Setup Powerpanel Plus Setup WindowAdvance This button opens the Advanced Setup Window If you are using PowerPanel Plus Powerpanel Plus Schedule MenuPowerpanel Plus LOG Menu Testing Your UPS SystemAVR Definitions for Illuminated LED IndicatorsPower Wiring Using Check Circuit Alarm ConditionSpecifications TroubleshootingProblem Possible Cause Solution Expected Runtime in Minutes Replacing the BatteryTo Replace the Battery Power Control Guarantee Limited WarrantyCPS1250AVR You FCC Notice Email sales@cyberpowersystems.com