Asante Technologies FS4016P manual Link/Activity, Color Status

Page 7

FS40016P.fm Page 7 Tuesday, March 16, 1999 5:53 PM

 

 

Asanté FriendlyNET FS4016P Installation Guide

 

Table 2: Link/Activity

 

 

 

 

Color

 

Status

 

 

 

 

 

Off

 

No link is established on the port.

 

 

 

 

 

Green

 

A 10Mbps Link is established on the

 

 

 

port.

 

 

 

 

 

Blinking green

 

A 10Mbps Link is established and traf-

 

 

 

fic is being received.

 

 

 

 

 

Yellow

 

A 100Mbps link is established on the

 

 

 

port.

 

 

 

 

 

Blinking Yellow

 

A 100Mbps link is established and traf-

 

 

 

fic is being received.

 

 

 

 

 

 

Table 3: Full Duplex/Collision

 

 

 

Color

 

Status

 

 

 

Off

 

There is no link. Or the port is operat-

 

 

ing in half-duplex mode.

 

 

 

Yellow

 

The port is operating in full-duplex

 

 

mode.

 

 

 

Blinking Yellow

 

The port is in the half-duplex mode and

 

 

a collision has occured.

 

 

 

Page 7

Image 7
Contents Product Introduction Installation Package ContentsFront & Rear Panel of the Asanté FriendlyNET FS4016P Desktop Placement 10Mbps Push button OUT position Using the Uplink connectionLED Indicators Power LEDColor Status Link/ActivityFull Auto Full/Auto Dip SwitchRack mounting in a 19 rack Mounting KIT Instruction10/100Base-TX UTP/STP Port Operating temperatureDimensions StandardsSupportedContacting Technical Support Asanté TECHNOLOGIES, INC., 821 FOX LANE, SAN JOSE, CA