Atmel AT91EB42 manual Section Appendix a Configuration Straps, Configuration Straps CB1 23, JP1

Page 15

Section 5

Appendix A – Configuration Straps

5.1Configuration Straps (CB1 - 23, JP1 - 8)

By adding the I/O and EBI expansion connectors, users can connect their own peripher- als to the evaluation board. These peripherals may require more I/O lines than available while the board is in its default state. Extra I/O lines can be made available by disabling some of the on-board peripherals or features. This is done using the configuration straps detailed below. Some of these straps present a default wire (notified by the default men- tion) that must be cut before soldering the strap.

CB1

On-board PB5/A23/CS4 Signal

 

 

Closed(1)

AT91 PB5/A23/CS4 signal is connected to the EBI expansion connector

 

(P1-B21).

 

 

Open

AT91 PB5/A23/CS4 signal is not connected to the EBI expansion connector

 

(P1-B21).

 

This authorizes users to connect the EBI expansion connector of this board

 

to the MPI expansion connector of an AT91EB63 Evaluation Board without

 

conflict problems.

 

 

 

 

CB2, CB3,

 

CB4

ADC Enabling

 

 

Closed(1)

ADC (U20) control lines enabled

Open

ADC (U20) control lines disabled. This authorizes users to connect the

 

corresponding PIO to their own resources via the I/O expansion connector.

 

 

 

 

CB5

Battery Power Supply Supervisory Enabling

 

 

Closed(1)

Battery power supply is supervised by the ADC (U20) channel 1 via a

 

resistor bridge. The ratio is set to 0.3333 so that the battery voltage range

 

can be supervised (5.5V to 6.2V).

 

 

Open

Battery power supply is not connected to the ADC (U20) channel 1. This

 

authorizes users to connect the corresponding ADC channel to their own

 

resources via the I/O expansion connector.

 

 

AT91EB42 Evaluation Board User Guide

5-1

Image 15
Contents AT91EB42 Evaluation Board User Guide Page Table of Contents Table of Contents Appendix a Configuration StrapsEvaluation Board Two serial ports Section OverviewScope DeliverablesASB OverviewSection Setting Up the AT91EB42 Evaluation Board Electrostatic WarningLayout Current TestingBoard MeasuringSection On-board Software AT91EB42 Evaluation BoardProgram On-board Software Programmed Default Memory MappingDefault Speed DownloaderExpansion ConnectorsSection Circuit Description ProcessorCrystal Quartz PowerMemories ConverterCircuit Description Circuit Description Configuration Straps CB1 23, JP1 Section Appendix a Configuration StrapsAppendix a Configuration Straps CB17 SPI Eeprom Enabling CB18 PB20 ADC Write Access SignalCB19 PB18 End of Fast Charge Signal CB15 Serial DataFlash EnablingJP6 Increasing Memory Size ConsumptionMeasurement Strap JP5Schematics Section Appendix B SchematicsPCB Layout Appendix B SchematicsEBI Memories AT91EB42 Evaluation Board User GuideAppendix EBI Memories SchematicsI/O and EBI Expansion Connectors Valbp Serial InterfaceAT91M42800 ICE Reset and Jtag Schematics InterfaceVDDCORE=1.8V Saft VRE 1/2 AA AT91EB42 Evaluation Board User Atmel Headquarters Atmel Operations