HSM 225.2 operating instructions Installation, Putting into operation, Scope of delivery

Page 4

HSM 225.2

Paper shredder

 

 

Maintenance and service work may be performed only by:

• HSM customer service

• specially trained staff (e.g. qualifi ed electricians)

service technicians from our contracting partners

4.Installation

This paper shredder should never be placed near or over a radiator or heat source.

The ventilation slots must not be blocked or covered and they must be at a distance of at least 10 cm away from walls or furni- ture.

Make sure the mains plug is easily acces- sible.

Before plugging in the mains plug, check that the voltage and frequency of your local mains supply correspond to those stated on the type plate.

Before start-up:

Undo the wing screws securing the unit du- ring transportation.

6. Putting into operation

Switching the paper shredder on

1 • Press rocker switch pos. 1.

Rocker switch locks in.

Green LED lights.

• Paper shredder is ready for ope- ration (standby).

Feed paper

See „Technical data“ for sheet capacity.

• The shredding process is started by a photo–cell in the paper feeding opening.

• When the paper feeding opening is free again, the cutting sy- stem automatically switches off after approx. 3 sec. and returns to standby.

Shredding CDs and disks (see “Pro- per Use”)

Feed CDs and disks through the slot in the safe- ty element. This protects you from splinters.

5. Scope of delivery

Paper shredder, ready for connection, in carton packing

5 Bags for shredded material

Special cutting block oil 50 ml (cross cut)

Operating instructions

Accessories:

Bag for shredded material, order No.: 1.410.995.000

Special cutting block oil 250 ml, order No.: 1.235.997.401

Switching paper shredder off

• Tap rocker switch pos. 2.

• Rocker switch resets to zero

2

position.

8

english

0510

Image 4
Contents HSM Aktenvernichter HSM Distruggidocumenti HSMDestructora de documentos HSM Destruidora de documentos HSMProper use, warranty Safety instructionsMachine components EnglishPutting into operation InstallationScope of delivery Troubleshooting Paper jam Maintenance and careCleaning Door contact interruptedTechnical Data Declaration of Conformity