3.3.Installation and Line processing of Speaker
Putting of speaker fixation ring
Speaker Fixation Ring
Put according to 4 ribs.
Processing of speaker cable
Solder
Match case sign to the center in the terminal of the speaker.
22.5mm From the rib to the terminal
Black line
Red line
Speaker Cable
The double coating part of
the cable according to the ditch of the case
The cable is not loosening between the rib and the pin.
Putting of speaker box
Touch the boss
Putting of speaker box
Touch the Case’s wall
3.4.Assembly of Touch Pad
Insertion of PAD FFC | Installation of pad button | |
| PAD FFC is | Puted in the gasket |
| ditch | |
| inserted in the | |
PAD FFC |
| |
connector. |
| |
| Inserted in the | |
| (Direction where | |
| positioning pin | |
| the reinforcement | |
|
| |
| version is seen) | Pad button |
|
| |
| Touch Pad |
|
Putting of PAD sheet
This line must become vertical
PAD sheet
After putting of the PAD sheet, the Flaking off paper is peeled off
Latch is inserted in the top case(4 places) | Sets in the dent |
Putting of touch pad |
| Putting of pad cover |
The hooks are hooked
Pin for positioning
The touch pad is put
Touch Pad
It is confirmed that all LED lenses fit in the hole of the pad cover
Pad Cover
The hooks are inserted