Telenetics MIU9.6FPD manual Local Analog Loopback Figure, Test 1 RTS/CTS Analog Control

Page 15

11.DIAGNOSTICS

The following pages provide hardware techniques for diagnosing communication problems and thereby isolating the problem at the local modem, the remote modem or the interconnecting line.

(a)LOCAL ANALOG LOOPBACK (Figure 2)

Requires a loop back cable with a built-in circuit for line loss to simulate a typical leased line condition (See Figure 3).

Connect the loop back cable to the RJ11 connector on the modem under test.

Set Dip Switches as follows…

Switch 7 = OFF

4-Wire

Switch 9

= ON

Soft Carrier Turn Off Enabled

Switch 1

= ON

Transmit (TxA) Signal Level = 0dBm

Switch 3

= ON

Receive (RxA) Signal Level = –33dBm

Switch 6

= OFF

Switched Carrier

Switch 4&5 = ON

RTS/CTS Delay = 50ms

Test 1: RTS/CTS Analog Control

Set RTS “ON” and check that CD (Carrier Detect) turns “ON”.

Turn RTS “OFF” and ensure that CD turns “OFF”

With RTS “ON”, run a test message at TxD and verify that the same message is received at RxD with no data errors.

Test 2: Transmit Signal Power & Receive Levels

Set Dip Switch 1 OFF (TxA = -10dBm)

CD will be OFF.

Change Dip Switch 1 to ON (TxA = 0dBm)

CD should now be ON.

MIU9.6FPD Installation, Operation & Diagnostics

April 25, 1998

Page 13

Image 15
Contents MIU9.6FPD Telenetics Corporation MIU9.6FPD Installation, Operation & Diagnostics April 25 Standards Product Overview Operating Temperature DimensionsWeight Surge Protection Power SupplyAnalog Interface Serial Formats and Flow ControlOther Features Dip Switch Selectable ~ See SectionConductor Type Analog Line SpecificationsPower Connections Serial Data Port PIN-OUTS OFF LED Indicator Outline Drawing & Mounting Test 2 Transmit Signal Power & Receive Levels Local Analog Loopback FigureTest 1 RTS/CTS Analog Control Test 3 Received Signal Level MIU9.6FPD Installation, Operation & Diagnostics April 25 Adjustments… Line DiagnosticsMIU9.6FPD Installation, Operation & Diagnostics April 25 MIU9.6FPD Installation, Operation & Diagnostics April 25 MIU9.6FPD Installation, Operation & Diagnostics April 25 MIU9.6FPD Installation, Operation & Diagnostics April 25