American Power Conversion RT 1000/2000 user manual Installation

Page 6

INSTALLATION

1.ATTACH THE SUPPORT FEET

If the UPS is to be operated in Tower Configuration the support feet must be attached for proper stability.

1.Locate the two feet and the plastic bag contain- ing the four screws packed with the UPS.

2.Gently lay the UPS on its side as shown.

3. Use the screws to attach the support feet se- curely to the bottom of the UPS in the holes pro- vided.

4. Carefully stand the unit upright upon the support feet.

2.REMOVE THE BATTERY DOOR

1. Facing the front of the UPS, locate the battery compartment. The battery connector is hanging from cables that lead through a hole in the bat- tery door and into the battery compartment.

2.Use a screwdriver to remove the two battery door screws located at the left side corners of the battery door. Set the screws aside in a safe place. You will replace them later.

3.Remove the battery door by sliding it along the

cables and past the connector (the connector will fit through the hole in the battery door). Set the battery door aside.

990-1060B 12/2005

4

Image 6
Contents APC Smart-UPSRT Page Safety Information Deenergizing Safety Installation Installation Connect the Battery Turn on the UPS Operation Power Cold Start Online Utility Voltage Battery Power Computer Inter Face Port Tvss Screw On Battery Operation Terminal Mode TRANSPORT, MAINTENANCE, and Troubleshooting Replacing the Battery Pack Troubleshooting Mark the RMA# on the outside of the package CONTACT, REGULATORY, and Warranty Information Limited Warranty