American Power Conversion Vac 120, VA 1000 Tower Configuration Mount the UPS in a Two-Post Rack

Page 4

Tower Configuration

Note: Illustrations in this document may appear different than the actual hardware.

Œ

Ž

Mount the UPS in a Two-Post Rack

Œ

Remove battery bracket screws, battery

 

bracket, and battery.

2

Image 4
Contents APC Smart-UPSSC Page Unpack IntroductionPosition the UPS Tower Configuration Mount the UPS in a Two-Post Rack Reinstall battery, battery bracket, and screws Connect Equipment to the UPS Connect the UPS to the Network if ApplicableStart the UPS Front Display Panel User Configurable Items 110/120 V model Battery Replacement StorageTROUBLESHOOTING, SHIPPING, and Service Replace BATTERY/BATTERY Disconnected LED is Illuminated Shipping and Service Regulatory and Warranty Information Limited Warranty